KILO · Oʻahu ADU pilot
An example of your ADU report
Illustrative example only — not an assessment of a real property.
Preliminary screening from public records and your answers. No site visit or individual professional review. This report does not establish ADU eligibility or permit approval.
Data coverage · not reported
Data coverage was not reported for this read. Treat the infrastructure and site findings as unverified until a new assessment confirms coverage.
01 · Start here
Resolve these questions before design
Published zoning limits are a starting point. Existing buildings, zoning-lot boundaries, access, private restrictions and agency capacity checks remain unresolved.
- CPR, HOA, or deed restrictions need document review. KILO has not searched the title or private covenants.
02 · Size and siting
1,000 sq ft ordinance ceiling
Mapped tax-parcel area: 6,000 sq ft. This ceiling assumes that area is the zoning lot. It is not available floor area or proof that a unit fits. A CPR unit’s address or tax parcel may not represent the whole zoning lot.
- Front yard · base district
- 10 ft
- Side yard · base district
- 5 ft
- Rear yard · base district
- 5 ft
- Lot coverage · base district
- 50 %
ROH Table 21-3.2 · verify project-specific requirements. These are base standards, not a drawn building envelope. Existing coverage, height, floor area, easements and overlays can change the applicable yards; R-3.5 side/rear yards can increase with proposed floor area.
Ask the designer to confirm ADU parking requirements and any transit exemption under ROH §21-6.30(b). This pilot does not measure parking eligibility or remaining buildable area.
03 · Infrastructure and site
The checks that still matter
Water supply · Not verified
DPP layer not available — agency pre-check needed. BWS must confirm service and capacity for the proposed additional demand. A service-area designation is not a new-meter commitment.
Wastewater · Not verified
A mapped system or nearby sewer does not establish capacity for another dwelling. Confirm with DPP Wastewater or DOH.
Flood · Not verified
Confirm flood-zone boundaries, elevation and building requirements with the designer and DPP.
SMA · Not verified
Confirm whether the proposed work needs coastal review; the mapped designation is a screening input.
Shoreline · Not verified
A certified shoreline and project-specific setbacks may be needed before siting a unit.
These findings come from the same KILO parcel assessment. “Not verified” and a silent public record are gaps, not permission. Cultural-resource and HRS §6E review remain part of the full parcel assessment and agency process; this focused ADU report does not resolve them.
04 · Use and ownership
An ADU and an ʻohana unit are different pathways
The cited Honolulu rule permits one ADU per zoning lot, with an otherwise permitted ʻohana unit treated separately. Do not assume that an ʻohana classification establishes ADU eligibility.
An ADU requires a recorded covenant for long-term residential occupancy. It cannot be used as a bed-and-breakfast or transient vacation unit, or separated from its principal dwelling’s ownership through a CPR. Existing private restrictions and title documents have not been reviewed.
ROH §21-5.50-3(a) · ADU standards ↗
HRS §46-4.8 sets a December 31, 2026 county implementation deadline for at least two ADUs or a reasonable equivalent, with alternative compliance paths and exceptions. It does not establish a two-ADU entitlement on this parcel. Confirm the rules in force when applying.
05 · Your project assumptions
Supplied by you · not verified against records
- What is on the property?
- One single-family home
- Does the zoning lot already have an ADU?
- No known ADU
- What are you considering?
- A new attached or detached ADU
- How would the unit be used?
- Long-term rental
- Any known CPR, HOA, or deed restrictions?
- I’m not sure
06 · Take this to the next conversation
Your next conversations
Ordered from your project answers. The sequence is a preparation aid; agencies and your project team must confirm the applicable pathway and requirements.